57.56 F
London
December 5, 2024
PI Global Investments
Infrastructure

Subsea7 connecting North Sea Belinda subsea infrastructure


Offshore staff

LUXEMBOURGSerica Energy has commissioned Subsea7 to manage subsea installations for the Belinda Field development, southeast of the Triton FPSO in the UK central North Sea.

The location is 190 km east of Aberdeen in a water depth of 95 m.

Subsea7’s work scope covers project management, engineering, procurement, construction and installation of a 5-km, 8-inch production pipeline with a 3-inch piggy-backed gas-lift line and an electro-hydraulic controls umbilical. 

In addition, the company will install associated subsea structures and perform tie-ins to the Dana Petroleum-operated FPSO via an existing production manifold near the Triton riser base, also fitting control connections at the Evelyn Field valve skid.

Offshore activities are due to take place in summer 2025.

Subsea7 said the contract is worth between $50 million and $150 million.

05.28.2024



Source link

Related posts

Idaho to receive $20M in Bipartisan Infrastructure Law funds for water infrastructure projects • Idaho Capital Sun

D.William

Mawani continues to enhance competitiveness of Saudi Ports with “Excellence in Port Infrastructure” award

D.William

“Authors of the Principles of Open Scholarly Infrastructure – Panel Discussion” at Force2024 Conference

D.William

Leave a Comment

* By using this form you agree with the storage and handling of your data by this website.