Vancouver, British Columbia–(Newsfile Corp. – June 24, 2026) – Prince Silver Corp. (CSE: PRNC) (OTCQX: PRNCF) (FSE: T130) (“Prince Silver” or the “Company”) is pleased to announce five additional drill hole assay results from its ongoing 9,000-metre reverse circulation (“RC”) drilling program at the Company’s Prince Silver Project (“Prince” or the “Prince Project”), located in the historic Pioche Mining District, Lincoln County, Nevada.
Results from five additional drill holes continue to demonstrate the scale and continuity of the Prince mineralizing system, confirming extensive silver-manganese-lead-zinc mineralization within the upper oxide horizon while further highlighting the growing significance of gold-rich sulphide mineralization at depth.
A key highlight was returned from hole PRC-44, which intersected 15.24 metres grading 2.41 g/t gold and 68.5 g/t silver from 259.08 metres, representing one of the strongest gold-bearing intervals encountered by the Company to date and reinforcing the emerging gold potential of the Project.
The Company has now received assay results from 25 of the initial 30 drill holes, with results continuing to validate management’s geological model and strengthen confidence in the potential for a large-scale, multi-metal mineralized system. In response to the success of the program, Prince Silver plans to expand the current campaign by a minimum of 10 additional drill holes.
Drill Hole Highlights
-
PRC-44: Multiple gold-silver and polymetallic intervals, including
-
15.24 m grading 2.41 g/t Au, 68.5 g/t Ag, 0.63% Mn, 1.98% Pb and 0.66% Zn from 259.08 m within the Combined Metals Bed
-
3.05 m grading 0.95 g/t Au, 55.0 g/t Ag, 0.14% Mn, 1.59% Pb and 0.25% Zn from 230.12 m
-
3.05 m grading 0.24 g/t Au, 124.5 g/t Ag, 7.10% Mn, 3.26% Pb and 5.78% Zn from 82.30 m
-
6.10 m grading 0.21 g/t Au, 57.8 g/t Ag, 8.56% Mn, 1.40% Pb and 3.09% Zn from 137.16 m
-
-
PRC-47: Broad Ag-Mn-Pb-Zn mineralization, including
-
30.48 m grading 39.4 g/t Ag, 11.87% Mn, 2.36% Pb and 1.42% Zn from 88.39 m
-
7.62 m grading 35.4 g/t Ag, 5.16% Mn, 2.03% Pb and 2.60% Zn from 156.97 m
-
4.57 m grading 71.0 g/t Ag, 9.71% Mn, 2.40% Pb and 2.70% Zn from 236.22 m
-
3.05 m grading 61.5 g/t Ag, 8.05% Mn, 0.55% Pb and 0.94% Zn from 271.27 m
-
-
PRC-48: Gold-silver-polymetallic mineralization
-
4.57 m grading 1.26 g/t Au, 65.0 g/t Ag, 3.39% Mn, 0.61% Pb and 0.79% Zn from 176.78 m
-
-
PRC-50: High-grade Ag-Mn mineralization, including
Reported intervals are downhole lengths. Apparent widths are considered close to true widths where holes were drilled approximately perpendicular to gently dipping mineralized beds; true widths have not been definitively established
